Amazon DCM5 Renovation
Pataskala, OH | Distribution Center
A site-wide renovation inside an active Amazon distribution center, centered on powering new high-speed sorting and conveyor automation.
Working up to 60 feet overhead, our team ran multiple 1-1/2” EMT runs from the main distribution panel across custom unistrut ladder racking and pulled 3/0 copper feeders to new equipment. New 125A breakers in the MDP required tightly coordinated facility shutdowns. We also installed 480V, 3-phase disconnects for conveyor merge points and sorters, SO-cord twist-lock drops for modular equipment, and full power for new air compressors, all with spotters and lift safety protocols in a live facility.